Publication detail
Thermal Disintegration of Sewage Sludge III
ELSÄSSER, T. HOUDKOVÁ, L. BRTNA, F.
Czech title
Termická desintegrace čistírenského kalu III
English title
Thermal Disintegration of Sewage Sludge III
Type
report
Language
en
Original abstract
This research report builds on previous two reports focused on description and evaluation of experiments of thermal and thermochemical disintegration of digested sludge. The effect on sludge dewatering was studied. Based on the laboratory tests the suitable conditions were chosen. A disintegration unit with the capacity of 10.8 t/d of a liquid sludge (refers to a wastewater treatment plant capacity of 10 000 population equivalents) was designed and the effect of disintegration of the back load of water line was assessed. Further, stress analysis and considerations concerning the vessel heating were elaborated. Finally, an economical evaluation of the process was carried out. In the evaluation, a payback period of approx. 15 y was determined, which emerges from the savings in sludge disposal.
Czech abstract
Výzkumná zpráva navazuje na předchozí dvě zprávy, které prezentují výsledky laboratorních experimentů zaměřených na termickou a termochemickou desintegraci. Při těchto experimentech byl sledován vliv desintegrace na odvodnitelnost kalu, rovněž byly hledány vhodné provozní podmínky. Na základě provedených experimentů byla navržena desintegrační jednotka vč. periferií pro čistírnu o kapacitě 10 000 EO, byl proveden pevnostní výpočet a návrh ohřevu kalu. Dále bylo pro zvolené provozní podmínky vyhodnoceno zpětné zatížení vodní linky ČOV, neboť při desintegraci se výrazně zvyšuje obsah nerozpuštěných látek ve fugátu. Závěrem bylo provedeno ekonomické hodnocení zapojení desintegrace do technologie kalového hospodářství, které při využití kalu ke kompostování dopadlo poměrně nepříznivě. Z výpočtů vychází, že doba návratnosti je přibližně 15 let a to pouze v případě, že k ohřevu kalu při desintegraci bude použito jen odpadní teplo.
English abstract
This research report builds on previous two reports focused on description and evaluation of experiments of thermal and thermochemical disintegration of digested sludge. The effect on sludge dewatering was studied. Based on the laboratory tests the suitable conditions were chosen. A disintegration unit with the capacity of 10.8 t/d of a liquid sludge (refers to a wastewater treatment plant capacity of 10 000 population equivalents) was designed and the effect of disintegration of the back load of water line was assessed. Further, stress analysis and considerations concerning the vessel heating were elaborated. Finally, an economical evaluation of the process was carried out. In the evaluation, a payback period of approx. 15 y was determined, which emerges from the savings in sludge disposal.
Keywords in Czech
Čistírenský kal, vyhnilý kal, desintegrace, odvodnitelnost, odstřeďování, obsah sušiny, nitrifikace
Keywords in English
Sewage sludge, digested sludge, disintegration, dewatering, centrifugation, total solids content, nitrification
Released
14.11.2011
Publisher
VUT v Brně
Location
Brno
Pages from–to
1–19
Pages count
19
BIBTEX
@techreport{BUT88748,
author="Thomas {Elsässer} and Lucie {Houdková} and Filip {Brtna},
title="Thermal Disintegration of Sewage Sludge III",
year="2011",
month="November",
pages="1--19",
publisher="VUT v Brně",
address="Brno"
}