System for Observing and Monitoring Deviations Between Scheduled and Actual State of A Project

BLÁHA, P.

English title

System for Observing and Monitoring Deviations Between Scheduled and Actual State of A Project

Type

conference paper

Language

en

Original abstract

This Article includes basic information about new nonconventional programmatic system developed for project management. This computer program is intended to be like a program tool, which can co-operate with other commercial programs. However in the first phase, this program was developed and testedtogether with Primavera Project Planner system. The philosophy goes from ideas of The SSD graph (LEE-KWANG H., Favrel J.: The SSD Graph: A Tool for Project Scheduling and Visualization. IEEE Trans. on Eng. Mana. Vol.35, No.1 (1998), pp. 25-30), applied on the present conditions and requirements in project management. The main benefits of these ideas to project management are simplification and conversion of the schedule structure of the appearance which is more lucid and we hope that is more convenient for the project managers, than by the conventional schedulers (Gantt chars). In other words, this program tool can be used like a kinf of data filter. The main interest is aimed only at the information about if the each task is just work or non work and at relationships between actual and target schedule (with using 3- and 5- valued algebra). Further, we expanded model features to include the history of the project progress states. In this program are also embedded statistical methods for detecting badly scheduled sections of the project.

English abstract

This Article includes basic information about new nonconventional programmatic system developed for project management. This computer program is intended to be like a program tool, which can co-operate with other commercial programs. However in the first phase, this program was developed and testedtogether with Primavera Project Planner system. The philosophy goes from ideas of The SSD graph (LEE-KWANG H., Favrel J.: The SSD Graph: A Tool for Project Scheduling and Visualization. IEEE Trans. on Eng. Mana. Vol.35, No.1 (1998), pp. 25-30), applied on the present conditions and requirements in project management. The main benefits of these ideas to project management are simplification and conversion of the schedule structure of the appearance which is more lucid and we hope that is more convenient for the project managers, than by the conventional schedulers (Gantt chars). In other words, this program tool can be used like a kinf of data filter. The main interest is aimed only at the information about if the each task is just work or non work and at relationships between actual and target schedule (with using 3- and 5- valued algebra). Further, we expanded model features to include the history of the project progress states. In this program are also embedded statistical methods for detecting badly scheduled sections of the project.

Keywords in English

project scheduling, monitoring, delays, accelerations, project management

RIV year

2002

Released

01.01.2001

Publisher

Association of European Operational Research Societies.

Location

Rotterdam, The Netherlands

Book

EURO 2001, the European Operational Research Conference Abstracts.

Pages count

1

BIBTEX


@inproceedings{BUT5770,
  author="Petr {Bláha},
  title="System for Observing and Monitoring Deviations Between Scheduled and Actual State of A Project",
  booktitle="EURO 2001, the European Operational Research Conference Abstracts.",
  year="2001",
  month="January",
  publisher="Association of European Operational Research Societies.",
  address="Rotterdam, The Netherlands"
}