Publication detail
Job Shop Scheduling with Transfer Batches
DVOŘÁK, J. ŠEDA, M. VLÁČIL, T.
Czech title
Rozvrhování zakázkové výroby s dopravními dávkami.
English title
Job Shop Scheduling with Transfer Batches
Type
book chapter
Language
en
Original abstract
This paper presents a job shop scheduling problem where each job (production batch) can be split into multiple equal-sized transfer batches which can be moved to the next operation immediately after their completion on the current operation. The start times of transfer batches need not be consider as decision variables and their values can be derived from start and completion times of operations on production batches. The presented approach uses a disjunctive graph model, whose size and structure is the same as in the case of the classical job shop problem, and modified Critical Path Method for computations in this graph. This approach can be integrated into any heuristic method for job shop scheduling which uses the disjunctive graph-based representation and the makespan objective.
Czech abstract
Tento článek se zabývá problémem rozvrhování zakázkové výroby, kde každá výrobní dávka může být rozdělena do více stejně velkých dopravních dávek, které mohou být přesunuty na další operaci bezprostředně po jejich ukončení na aktuální operaci. Termíny začátků zpracování dopravních dávek nemusejí být uvažovány jako rozhodovací proměnné a jejich hodnoty mohou být odvozeny z termínů zahájení a ukončení operací na výrobních dávkách. Navržený přístup využívá disjunktivní graf, jehož velikost a struktura jsou stejné jako v případě klasického problému zakázkové výroby, a modifikovanou metodu CPM pro výpočty v tomto grafu. Tento přístup může být integrován do jakékoli heuristické metody pro rozvrhování zakázkové výroby, která pracuje s disjunktivním grafem a používá jako kritérium celkovou dobu trvání rozvrhu.
English abstract
This paper presents a job shop scheduling problem where each job (production batch) can be split into multiple equal-sized transfer batches which can be moved to the next operation immediately after their completion on the current operation. The start times of transfer batches need not be consider as decision variables and their values can be derived from start and completion times of operations on production batches. The presented approach uses a disjunctive graph model, whose size and structure is the same as in the case of the classical job shop problem, and modified Critical Path Method for computations in this graph. This approach can be integrated into any heuristic method for job shop scheduling which uses the disjunctive graph-based representation and the makespan objective.
Keywords in English
job shop scheduling, disjunctive graph, transfer batch, heuristic methods
RIV year
2000
Released
01.01.2000
Publisher
Physica-Verlag
Location
Heidelberg
ISBN
3-7908-1257-9
Book
Robert John, Ralph Birkenhead (eds.) Soft Computing Techniques and Applications
Pages count
6
BIBTEX
@inbook{BUT54982,
author="Jiří {Dvořák} and Tomáš {Vláčil} and Miloš {Šeda},
title="Job Shop Scheduling with Transfer Batches",
booktitle="Robert John, Ralph Birkenhead (eds.) Soft Computing Techniques and Applications",
year="2000",
month="January",
publisher="Physica-Verlag",
address="Heidelberg",
isbn="3-7908-1257-9"
}