The reconstruction of our campus continues, which unfortunately brings more restrictions on the other side!
As of Monday 28 November 2022, the space between buildings A3, A4, A2, B2 and B3 will be taken over for the construction site of the reconstruction of building A2, section S2. The exact view is in the drawing. The area will be demarcated by fences and signs.
Another essential measure is the closure of the KH2 articulated hall connecting buildings A4 and A5. Hall KH2 will be closed for reconstruction on all floors. It is necessary to bypass buildings A2 and KH2 by a route through buildings B (see blue arrows in the drawing), specifically in building B2 first and last floor. The remaining second and third floors are also construction sites. All areas will be adequately marked with signs and barriers to entry.
In some cases, it may be quicker to use the outside space in front of A5 and A4 along Technical Street to transition between buildings.
Please allow for these changes, which unfortunately may significantly lengthen the move between buildings.
Thank you for understanding and respecting these changes.