Detail publikace
Implementační pohled na rozvrhování zakázkové výroby založený na metodě CPM
ŠEDA, M.
Český název
Implementační pohled na rozvrhování zakázkové výroby založený na metodě CPM
Anglický název
An Implementation View on Job Shop Scheduling Based on CPM
Typ
článek ve sborníku ve WoS nebo Scopus
Jazyk
en
Originální abstrakt
The scheduling of manufacturing processes aims to find sequences of jobs on given machines optimal by a selected criterion, e.g. minimal completion time of all operations. With respect to NP-hardness of these problems and the necessity to solve them by heuristic methods, the problem representation and the effectiveness of their procedures is substantial for computations to be completed in a reasonable amount of time. In this paper, we deal with job shop scheduling problem (JSSP) in a disjunctive graph-based representation. Turning all undirected edges into directed ones, the problem is transformed to a problem solvable by the Critical Path Method (CPM). We propose an original implementation of the CPM that makes it possible to decrease its time complexity and thus also the running time of all JSSP iterations.
Český abstrakt
V rozvrhování výrobních procesů je cílem nalezení optimálního pořadí úloh tvořených skupinou operací na jednotlivých výrobních zařízeních (strojích) vzhledem k zvolenému kritériu optimality. Vzhledem k tomu, že tyto problémy jsou NP-těžké a nutnosti řešit je heuristickými metodami, je reprezentace problému a efektivita jeho procedur je podstatná pro dokončení výpočtu v rozumném čase. V tomto příspěvku se zabýváme rozvrhováním zakázkové (nebo také kusové) výroby a jeho reprezentací disjunktivním grafem. Jestliže zvolíme orientaci pro neorientované hrany, pak problém se transformuje na problém řešitelný metodou kritické cesty. Navrhujeme originální implementaci této metody, která umožňuje snížit její časovou složitost a tím čas výpočtu všech iterací výpočtu rozvrhu zakázkové výroby.
Anglický abstrakt
The scheduling of manufacturing processes aims to find sequences of jobs on given machines optimal by a selected criterion, e.g. minimal completion time of all operations. With respect to NP-hardness of these problems and the necessity to solve them by heuristic methods, the problem representation and the effectiveness of their procedures is substantial for computations to be completed in a reasonable amount of time. In this paper, we deal with job shop scheduling problem (JSSP) in a disjunctive graph-based representation. Turning all undirected edges into directed ones, the problem is transformed to a problem solvable by the Critical Path Method (CPM). We propose an original implementation of the CPM that makes it possible to decrease its time complexity and thus also the running time of all JSSP iterations.
Klíčová slova česky
výrobní proces, rozvrhování zakázkové výroby, NP-těžký problém, disjunktivní graf, CPM
Klíčová slova anglicky
manufacturing process, job shop scheduling, NP-hard problem, disjunctive graph, CPM
Rok RIV
2007
Vydáno
01.07.2007
Nakladatel
WSEAS Press
Místo
Crete Island (Greece)
ISBN
978-960-8457-92-8
Kniha
Proceedings of the 11th WSEAS International Conference on Computers
Strany od–do
540–545
Počet stran
6
BIBTEX
@inproceedings{BUT23385,
author="Miloš {Šeda},
title="An Implementation View on Job Shop Scheduling Based on CPM",
booktitle="Proceedings of the 11th WSEAS International Conference on Computers",
year="2007",
month="July",
pages="540--545",
publisher="WSEAS Press",
address="Crete Island (Greece)",
isbn="978-960-8457-92-8"
}