Flexibilní heuristiky pro rozvrhování projektů s omezenými zdroji

ŠEDA, M.

Český název

Flexibilní heuristiky pro rozvrhování projektů s omezenými zdroji

Anglický název

Flexible Heuristics for Project Scheduling with Limited Resources

Typ

článek v časopise - ostatní, Jost

Jazyk

en

Originální abstrakt

Resource-constrained project scheduling is an NP-hard optimisation problem. There are many different heuristic strategies how to shift activities in time when resource requirements exceed their available amounts. These strategies are frequently based on priorities of activities. In this paper, we assume that a suitable heuristic has been chosen to decide which activities should be performed immediately and which should be postponed and investigate the resource-constrained project scheduling problem (RCPSP) from the implementation point of view. We propose an efficient routine that, instead of shifting the activities, extends their duration. It makes it possible to break down their duration into active and sleeping subintervals. Then we can apply the classical Critical Path Method that needs only polynomial running time. This algorithm can simply be adapted for multiproject scheduling with limited resources.

Český abstrakt

Rozvrhování projektů s omezenými zdroji patří mezi NP-těžké optimalizační problémy. Existuje mnoho heuristických strategií, jak posouvat činnosti v čase, pokud požadavky na zdroje překračují jejich disponibilní množství. Tyto strategie jsou často založeny na prioritách činností. V příspěvku předpokládáme, že již byla zvolena vhodná heuristika pro rozhodnutí, které činnosti by se měly provést hned a které odsunout na pozdější dobu, a problém rozvrhování projektů s omezenými zdroji zkoumáme z implementačního pohledu. Navrhujeme efektivní proceduru, která místo posouvání činností v čase prodlužuje jejich trvání. To umožňuje rozdělit jejich provádění na aktivní a neaktivní subintervaly. Pak můžeme aplikovat klasickou metodu kritické cesty, jejíž potřebný čas výpočtu je polynomiální. Navržený algoritmus lze snadno modifikovat pro souběžné rozvrhování většího počtu projektů s omezenými zdroji.

Anglický abstrakt

Resource-constrained project scheduling is an NP-hard optimisation problem. There are many different heuristic strategies how to shift activities in time when resource requirements exceed their available amounts. These strategies are frequently based on priorities of activities. In this paper, we assume that a suitable heuristic has been chosen to decide which activities should be performed immediately and which should be postponed and investigate the resource-constrained project scheduling problem (RCPSP) from the implementation point of view. We propose an efficient routine that, instead of shifting the activities, extends their duration. It makes it possible to break down their duration into active and sleeping subintervals. Then we can apply the classical Critical Path Method that needs only polynomial running time. This algorithm can simply be adapted for multiproject scheduling with limited resources.

Klíčová slova česky

projektové řízení, rozvrhování s omezenými zdroji, NP-těžký problém, CPM, heuristická metoda

Klíčová slova anglicky

project management, resource-constrained scheduling, NP-hard problem, CPM, heuristic method

Rok RIV

2007

Vydáno

01.10.2007

ISSN

1307-6906

Časopis

International Journal of Applied Mathematics and Computer Science

Ročník

4

Číslo

4

Strany od–do

196–200

Počet stran

5

BIBTEX


@article{BUT44681,
  author="Miloš {Šeda},
  title="Flexible Heuristics for Project Scheduling with Limited Resources",
  journal="International Journal of Applied Mathematics and Computer Science",
  year="2007",
  volume="4",
  number="4",
  month="October",
  pages="196--200",
  issn="1307-6906"
}