Combined heat and power production planning in a waste-to-energy plant on a short-term basis

TOUŠ, M. PAVLAS, M. PUTNA, O. STEHLÍK, P. CRHA, L.

Anglický název

Combined heat and power production planning in a waste-to-energy plant on a short-term basis

Typ

článek v časopise ve Web of Science, Jimp

Jazyk

en

Originální abstrakt

In many cases, WtE (waste-to-energy) plants are CHP (combined heat and power) producers. They are often integrated into a central heating system and they also export electricity to the grid. Therefore, they have to plan their operation on a long-term basis (months, years) as well as on a short-term basis (hours, days). Simulation models can effectively support decision making in CHP production planning. In general, CHP production planning on a short-term basis is a challenging task for WtE plants. This article presents a simulation based support. It is demonstrated on an example involving a real WtE plant. Most of the models of relevant WtE sub-systems (boilers, steam turbine) are developed using operational data and applying linear regression and artificial neural network technique. The process randomness given mainly by fluctuating heating value of waste leads to uncertainty in a calculation of CHP production and a stochastic approach is appropriate. The models of the sub-systems are, therefore, extended of a stochastic part and Monte-Carlo simulation is applied. Compared to the current planning strategy in the involved WtE plant, the stochastic simulation based planning provides increased CHP production resulting in better net thermal efficiency and increased revenue. This is demonstrated through a comparison using real operational data.

Anglický abstrakt

In many cases, WtE (waste-to-energy) plants are CHP (combined heat and power) producers. They are often integrated into a central heating system and they also export electricity to the grid. Therefore, they have to plan their operation on a long-term basis (months, years) as well as on a short-term basis (hours, days). Simulation models can effectively support decision making in CHP production planning. In general, CHP production planning on a short-term basis is a challenging task for WtE plants. This article presents a simulation based support. It is demonstrated on an example involving a real WtE plant. Most of the models of relevant WtE sub-systems (boilers, steam turbine) are developed using operational data and applying linear regression and artificial neural network technique. The process randomness given mainly by fluctuating heating value of waste leads to uncertainty in a calculation of CHP production and a stochastic approach is appropriate. The models of the sub-systems are, therefore, extended of a stochastic part and Monte-Carlo simulation is applied. Compared to the current planning strategy in the involved WtE plant, the stochastic simulation based planning provides increased CHP production resulting in better net thermal efficiency and increased revenue. This is demonstrated through a comparison using real operational data.

Klíčová slova anglicky

Waste-to-energy; Short-term; Combined heat and power; Black-box modelling; Planning; Stochastic simulation

Rok RIV

2015

Vydáno

30.06.2015

ISSN

0360-5442

Číslo

90

Strany od–do

137–147

Počet stran

11

BIBTEX


@article{BUT121007,
  author="Michal {Touš} and Martin {Pavlas} and Ondřej {Putna} and Petr {Stehlík} and Lukáš {Crha},
  title="Combined heat and power production planning in a waste-to-energy plant on a short-term basis",
  year="2015",
  number="90",
  month="June",
  pages="137--147",
  issn="0360-5442"
}